You don't have javascript enabled. Good luck with that.
Pencarian
larso marbun kadisdik dki jakarta beritajakarta

City Education Dept Forbids Students Celebrating UN by Convoying

National Examination (UN) SMA/SMK level participants are waiting the UN result that will be announced Tuesday (5/20) tomorrow. City Education Department urges all students not to celebrate the passing by scratching and convoying.

We urge students not to being exaggerated in celebrating UN passing. Please remind them not to scratching or convoying

Head of City Education Department, Lasro Marbun, uttered that the passing will be announced simultaneously on Tuesday (5/20). “We urge students not to being exaggerated in celebrating UN passing. Please remind them not to scratching or convoying,” said Marbun, Monday (5/19).

The school party is also urged to control its students to avoid brawl. “We are afraid if the convoy could trigger brawl between students,” Marbun concerned.

SMA 18 Warakas Building Heavily Damaged

Marbun’s party has also sent a letter to City Metro Police to control celebrating UN passing with exaggerated way. “The passing will be announced in website so that students do not need to come to the school to see UN passing,” explained Marbun.

Marbun also hoped the SMA/SMK passing grade in the capital city could be achieve better passing grade. “At least they could maintain just like last year, but we hope they can achieve more,” he completed.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1303 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye844 personAldi Geri Lumban Tobing